IntelliManage - הפרויקט מתקצר - ומהר
הפרויקט מתקצר - ומהר
זה הזמן להדק את החגורה:
קיצור לוחות הזמנים לחסכון בתקציב,
בסביבה משתנה וביכולות מצטמצמות.
         מתחילים כאן         
בלוג


Measuring programming progress by lines of code is like measuring aircraft building progress by weight.

נכתב ע"י: ביל גייטס


ציטוטים רלוונטיים נוספים:
“We flew down weekly to meet with IBM, but they thought the way to measure software was the amount of code we wrote, when really the better the software, the fewer lines of code.”
- Bill Gates.

"In IBM there's a religion in software that says you have to count K-LOCs, and a K-LOC is a thousand line of code. How big a project is it? Oh, it's sort of a 10K-LOC project. This is a 20K-LOCer. And this is 5OK-LOCs. And IBM wanted to sort of make it the religion about how we got paid. How much money we made off OS 2, how much they did. How many K-LOCs did you do? And we kept trying to convince them - hey, if we have - a developer's got a good idea and he can get something done in 4K-LOCs instead of 20K-LOCs, should we make less money? Because he's made something smaller and faster, less KLOC. K-LOCs, K-LOCs, that's the methodology. Ugh anyway, that always makes my back just crinkle up at the thought of the whole thing."
- Steve Ballmer.

 
   מה דעתך?

שתפו אחרים

שתפו אחרים
שתפו אחרים
שתפו אחרים
 
בבלוג שלנו מופיעים מאמרים, טיפים, ציטוטים, מיתוסים ופינת הטריוויה.

לקבלת הודעה כאשר מתפרסם תוכן חדש בבלוג,
עקבו אחרינו
מקימים/משדרגים פעילות PMO?

  • הטמעת מתודולוגיה מהירה.
  • הקמת/שדרוג הפעילות.
  • ליווי מקצועי.
לקבלת תוצאות יוצאות דופן.


מתחילים כאן
     


בונוס
תמיכה טלפונית


Copyright © 2000-2024 IntelliManage, All rights reserved.